This article presents a "snapshot" of service on Route 51 between the 27th of January and 23rd of February in 2025. Data from Transsee.


Cancellations
Over the period of four weeks, the route saw an average of 9.6% cancellations. Eastbound (towards Tunney's Pasture) cancellations were 8.4%; westbound (towards Lincoln Fields/Britannia) cancellations were 10.6%.

Headways


Apart from week four, which saw the aftermath of the giant snowfall over the few days prior, the route shows the usual patterns: large deviations in the AM, falling somewhat in the midday. It then rises to its peak in the PM peak, along with a higher rate of cancellations, before falling again in the evening.


The westbound deviation is smaller in the AM. However, bunching begins to form after lunch, peaking around the late afternoon/early peak before falling again in the evenings. Cancellations are very high around 15:00-16:00, the peak direction and peak period of travel. Week four shows a large anomaly of delays, due to the high snowfall.
On Time PerformanceOn time performance on Route 51 varies by time of day and direction.


Eastbound on time performance is poor across the route. It also shows signs of inadequate travel time, especially eastbound.


In the AM peak, there are significant delays on the Britannia branch, but limited delays on the short turns to Lincoln Fields.


In the PM peak, both branches see significant delays, coming from both interlining and a poorly written schedule which propagates delays (especially on the Britannia branch).


On time performance is not much better going westbound, and it also shows signs of inadequate scheduled travel time.


In the AM, there are already delays originating from this route. They appear on both branches.


Performance is atrocious westbound in the PM, with very high delays at Tunney's Pasture, and some more appear going west.
Weekend performance is not good either. Apart from the eastbound short turn, they all show significant evidence of delay propagation along the route, in addition to interlining delays (153 interference?)




As always, string diagrams can show more granular problems than weekly or monthly averages. The charts below show Thursday and Saturday.
The entirety of week two is available in this PDF. Weekends here.



On Thursday, problems become evident.
- Richmond is a problem all-day in the eastbound. Either the route could use increased runtimes, or it could be removed from Richmond and run down Byron instead like its pre-2011 alignment.
- Carlingwood is a problem all day.
- Travel times are slow on certain trips approaching and departing Lincoln Fields, including Carling.
- Blending of the two branches is surprisingly healthy.



On Saturdays, blending is less healthy, with many eastbound trips leaving Carlingwood bunched. Similar problems as weekdays appear as well.
Travel TimeNote that these charts only contain weeks 2-4.


Between Carlingwood and Kirkwood/Clare, travel times, while variable, are not out of control - this route's nature as a residential one should, in theory, insulate it from unreliability. Yet OC Transpo proposes to reduce the already inadequate travel time even further, presumably to save money, and in the peak direction as well.
When Amilcar says that the schedules will be more suited to traffic patterns after New Ways to Bus, I do not think she is telling the full truth.


Bafflingly, New Ways to Bus will increase runtimes in the counterpeak, but not the peak direction, and this is despite both directions seeing a large deficit in their scheduled runtimes.
Like in the AM, travel times are mostly under control - ensuring reliability on this route is a matter of scheduling enough runtime to make it. For the most part, the EB direction in the counterpeak makes that cut.


Travel times are under control. As mentioned, the route's nature as a residential line insulates it from the worst of the traffic than can affect mainlines like the 39 and 88. New Ways to Bus is a moderate improvement for this traffic direction.


The runtimes are the least reliable in this period, but they are still not bad, compared to other routes operated by OC Transpo. The effect of the snowstorms are evident in the week four data, which show a much greater top quartile.